MissionServicesLinksProjectsTechnologiesNews
Geothermal Projects
Environmental Projects

Geotechnical Projects
Construction Projects
Landfill Projects
Water Supply/Pump Testing Projects
BMW Landfill Gas Vent Installation Project
Carver, Massachusetts
Client: Lopes Construction Co.
References: Jim Borges, Lopes Construction Co., Acushnet, MA
Services:
  • 24-inch O.D. Dual Auger Abrasion Drilling to depths of 125 feet.
  • Gas vent well and monitoring well installations.
  • Methane monitoring.
Brimball Ave Landfill Gas Vent Installation Project
Beverly, Massachusetts
Client: DRL Corporation
Reference: Dan Galante, DRL Corporation, Oxford, MA
Services:
  • 24-inch O.D. Dual Auger Abrasion Drilling to depths of 45 feet.
  • Gas vent well and monitoring well installations.
  • Bedrock well pressure grouting and abandonment.
Barnstable Landfill Gas Vent Installation Project
Barnstable, Massachusetts
Client: Town of Barnstable
Reference: Mark Ells, Barnstable DPW, Barnstable, MA
Services:
  • 24-inch O.D. Dual Auger Abrasion Drilling to depths of 60 feet.
  • Gas vent installations.
US Waste Landfill Repair Project
Pen Argyl, Pennsylvania
Client: Westmar, Inc.
Reference: Mark Westerman, Westmar, Inc., Whitesboro, TX
Services:
  • Geotechnical drilling and split-spoon soil sampling to depths of 180 feet.
  • All-terrain drilling
Corporate Offices: 134 Whittier Highway, Meredith, NH 03253 - Phone 603/279-5080 Fax 603/279-0436
2696 Cranberry Highway, Wareham, MA 02571 - Phone 508/295-9040 Fax 508/295-9007 Toll Free: (888) DRAGIN-1